 |  | 


JIT is the second CD suggested in the series to purchase after LMM CD. You can play these trainings on a PC alone or as a Group Training in a Conference Room with a PC, Projector & Sound Systen. This particular product, JIT is a detailed training about the purpose of JIT, three elements of JIT (Pull Systems, Takt Time, Continuous Flow), & causes of stagnation (Large Lot Size, Complicated Flow, Poor Logistics & Conveyance, and a Poor Belief that Sales Pace = Prod. Pace) & the solutions for these causes of stagnation. Use Info button in Nav Bar at left for detailed description.
|
|