 |  | 


Pull System 4 Components is the fourth training in the series. These trainings can be viewed alone on a PC or as a Group Training in a Conference with a PC, Projector and Sound System. This training contains a great example of a Pull System with Timing Control KanBan, Tug Conveyance, and Manufacturing Floor / Warehouse Mirror system.
Use INFO button in Nav Bar at left for more detailed descriptions.
|
|