 |  | 


Pull System 4 Finished Goods is the fifth training in the series. These trainings can be viewed alone on a PC or as a Group Training in a Conference with a PC, Projector and Sound System. This training contains a great example of a Pull System with Timing Control KanBan, & Introduction to Heiunka (Level) Schedule Timing Control. Use Info button at left for more detail.
|
|